Below are the Priority Level 1 Projects for Closed FY 2023, listed by project, completion date, and description.

Move UMD Safe Office to UMB campus network
Completed - 7-18-2022 ![]()
Transitioned the administration of the technical aspects of the S.A.F.E. Center initiative from College Park to UMB.
Enabling access to Azure for School IT groups
Completed - 8-5-2022
This project involves networking set up, administration/billing operations, permissions and providing the school IT groups the ability to stand up servers.
Replace Cisco VPN with Palo Alto VPN
Completed - 8-11-2022
We moved our VPN from the Cisco solution to the Palo Alto solution.
MediaSite and MyMediaSite to the Cloud
Completed - 8-15-2022
We moved both our applications MediaSite and MyMediaSite to the Cloud
Wired and wireless network upgrades in residence halls
Completed - 8-26-2022
Upgraded the networks in Pascault Row and Fayette Housing residence halls with wired and wireless networks.
Shibboleth Upgrade
Completed - 9-15-2022
An upgrade to Shibboleth, the application that drives our Single Sign-On, was needed due to a new workflow for Duo, the application we use for multi-factor authentication.
Give Campus Implementation
Completed - 9-27-2022
This project replaced the online philanthropy giving system Give Corp with the new system, Give Campus.
HCM Discovery Phase
Completed - 9-30-2022
This was the Discovery phase for choosing a solution to replace the PeopleSoft human capital management system.
Banner Self Service 9 Implementation
Completed - 10-17-2022
Implemented the Student and Faculty modules of Banner Self Service (SSB) v9.
Shibboleth move to Azure
Completed - 10-22-2022
Moved Shibboleth, the application that drives our Single Sign-On, from physical servers and into the Azure cloud environment.
Decommission eUMB - Financials and Raven
Completed - 1-10-2023
Decommissioned both Financials and Raven from eUMB.
Wireless connectivity for Community Engagement Center Tax Prep Services
Completed - 1-27-2023
Assisted the Community Engagement Center with ensuring their tax prep services for the neighborhood community used the proper security encryption.
Degree Works Upgrade
Completed - 3-3-2023
A routine upgrade of Degree Works.
PDP System
Completed - 3-24-2023
Create an electronic system for the Performance Development Program (PDP)
Terminal 4 (T4) Upgrade
Completed - 3-31-2023
Upgraded Terminal 4 (T4), the web content management tool, to a Linux environment. Included converting ASP applications to PHP and upgrading PHP to v8.
LDAP – MFA Compliance
Completed - 3-31-2023
Ensure that all applications that still use LDAP are either protected by MFA in some manner, or have a documented exception why they cannot be MFA protected.
Veeam implementation in Azure
Completed - 4-28-2023
Implement Veeam within Azure (Azure backup, Azure storage for on-prem, and Azure migration functions)
Data Cookbook installation & setup
Completed - 5-15-2023
Install and initially setup the Data Cookbook Cloud application to capture data & reporting documentation as well as to enable data quality assurance capabilities.
HCM Pre-Implementation Phase
Completed - 6-30-2023
Used deliverables form the Discovery phase to plan our implementation of the Oracle HCM Cloud solution to replace the existing eUMB PeopleSoft HRMS application.
New Portal for Veterinarian Resources (Cayuse)
Completed - 7-1-2023
This project create a new online, cloud-based portal for veterinarian resources for the School of Medicine.