Cycling Studio HVAC

 

  Cycling studio set up with several bikes in rows

In the winter of 2018, we identified that the current cycling studio space was not sufficient for the activity. After initial attempts to relocate the cycling studio to another space within the building were not financially feasible, it was decided to address the current space deficiencies, with the HVAC system as the top priority. 

The current HVAC system that supports the cycling studio is not sufficient in suppling enough cooled air to the space. This project is looking at increasing the supply of cooled air, removing warm air, and controlling humidity. 

Current Project Status as of 8/20/19: Project Initiation and Design 

Expected Project End Date: Summer 2020