Facilities Upgrades

Parking and Transportation Services is proud of the facilities and services we offer. Take a look at what we've done!

Lexington Garage Facilities Upgrades 2020

Lexington Street Garage

  • Fire alarm system replacement
  • Automated access control and payment processing
  • Exterior building canopy
  • Modifications to parking attendant booths
  • Upgrades to doors to make them ADA compliant
  • Emergency generator installed

 

Pratt Garage 2020 reno

Pratt Street Garage

  • Repair of garage access drive lanes and drains
  • Replacement of trees and shrubs along Pratt Street
  • Renovations of lower-level ventilation system and Co/No sensors
  • Replacement of fire alarm system
  • Replacement of exhaust system
  • Concrete restoration
  • Water penetration 
Baltimore Grand Elevator Reno 2020

Baltimore Grand Garage

  • Lamp retrofit from high-pressure sodium to brighter, energy-efficient LED fixtures, reducing electric load on the campus grid
  • Replacement of cashier booths
  • Renovations, safety upgrades, and structural evaluations
  • Wayfinding graphics, deck coating, and façade repair
Penn Lighting Upgrade 2020

Penn Street Garage

  • Fire alarm system replacement
  • Replacement of interior drainage system
  • Renovations, modernization/life-safety projects
  • LED lighting upgrade
Pearl Garage Facilities Upgrades 2020

Pearl Street Garage

  • Structural repairs and renovations
  • Upgrades to doors to make them ADA compliant
  • Installation of security monitors “real-time” viewing
  • HVAC replacement
  • Renovations, modernization/life-safety projects
  • Structural deck repairs, restriping, caulk joint replacement, replacement of rooftop deck coating, and drainage system
  • Elevator modernization
  • Way-finding and graphics applied to wall and columns throughout the facility

Plaza Garage

  • Ventilation fan system and fire alarm system replacement
  • Waterproofing
  • Security camera network installed for remote monitoring and redesigning of entry guard station
  • LPR system that identifies your vehicle based on your license plate number(s) on file
  • Concrete deck/slab repair, structural reinforcement and way-finding and graphics applied to wall and columns throughout the facility 
  • Modernization of existing two elevators and installation of a new third elevator
  • LED lighting upgrade 
Saratoga Garage 2020

Saratoga Street Garage

  • Fire alarm replacement
  • Booth replacement
Koesters Lot 2020

Koester's Lot

  • Repaved and striped lot

Moving Forward

  • Several large-scale facility projects will require additional funding as we await structural assessments and campus directives
  • Hardware/software upgrades for new regulatory credit card payment processing
  • Penn Street Garage graphics package
  • Saratoga Street Garage renovations and deck coating
  • Baltimore Grand installation of a bike storage room
  • Koester's Lot installation of electric charging stations (sponsored by BGE)